PHOTO GALLERY

 

New in 2007, seawall and bottom wash water recovery system.
Inside the shed for the new wash water filtration system.
Mast prepared to go out of the loft to be stepped.
A winter visitor claims a sunny spot on the dock.
Two riggers complete work on a new sail track.
New Seawall being installed on the southern side of the boatyard.
Cyclone Class Patrol Coastal Boat USS Whirlwind (PC-11) at Front Dock.
Stepping the main mast at the Front Dock.
Launching Tamarack with 35 ton Brownell Yard Boss and 30 ton Travel lift.
A L. Francis Herreshof design Mobjack at the front dock.
Carpenter working on wooden boat.
Fine Finish work on the
Riva Aquarama Special "Pluto"